Skip to content

Since 2003Our team has helped over 20,000 UK businessesCollection from Unit 3, 116 Bury New Road, Manchester M8 8EB

Call 0161 315 1151WhatsApp 07737 902425hello@webprintsigns.co.uk

Web Print & Signs
0161 315 1151 Basket0 Get a free quote
  • Business Cards from £24.46
  • Flyers from £28.97
  • Menus from £11.40
  • Stickers from £30.74
  • Banners from £40.78
  • Posters from £19.87
  • Display from £44.95
  • Signage & Boards from £4.18
  • Clothing & promo from £13.25
  • Starter Website £599.00
  • SEO Fix Package £299.00
  • Print delivered UK-wide
  • Every file checked by a person before it is printed
  • Collection Unit 3, 116 Bury New Road, Manchester M8 8EB
  • Trading since 2003
WPS 000 · Web, print and signs

Advertisement Consent Eccles

A new sign for a shop in Eccles town centre or a trade unit near the motorway may need advertisement consent from Salford City Council, especially if it is lit, large or high on the building. We design the sign, prepare the drawings and plans, submit the application for you and fit the sign once it is approved.

  • Since 2003trading in Manchester
  • 20,000+UK businesses helped
  • Collect M8Unit 3, 116 Bury New Road
  • A personchecks every file
WPS 700

Talk to a real person

Our team has helped over 20,000 UK businesses. Come in, call us or we come to you.

Visit or collectUnit 3, 116 Bury New Road, Manchester M8 8EBGet a free quote

Eccles signs that often need consent

In the town centre, older buildings around Church Street mean the council looks at how a sign suits the frontage. Near the M60 and M602, businesses want to be seen from the road, which means bigger signs, illuminated letters high up and freestanding signs at entrances. Those are the signs a council looks at most closely.

Not every sign needs an application. Many modest non-illuminated fascias fall within the limits allowed without one. We check before anything is made. Our advertisement consent Manchester page explains the general rules.

Survey and application

Eccles is roughly 20 to 25 minutes from our office via the M602 or the A57, depending on traffic. We visit to measure and photograph the building and street, then prepare the drawings and application remotely, sending drafts to you to check by email.

Steps to an approved sign

1

Survey

We measure and photograph the site.

2

Design

We plan the sign’s size, lighting and position with approval in mind.

3

Drawings

Scaled drawings, a location plan and a site plan are produced.

4

Submission

We submit to the council and handle its questions.

5

Installation

The approved sign is made and fitted.

What we prepare

  • A visual of the sign on your building
  • Front and side drawings with dimensions and materials
  • Illumination details
  • Location and site plans showing freestanding signs
  • The submitted application
  • Revised drawings if changes are asked for

Signs facing the motorway and main roads

Businesses near the M60 and M602 often want drivers to spot them from the road. That raises questions the council takes seriously: how bright the sign is, how large, how high and whether it could distract drivers. A sign that is sized and lit sensibly can still be read clearly from a distance and is far more likely to be accepted than the largest sign the wall can take.

Freestanding totems and post signs at entrances need their position shown on a site plan, with their height and distance from the road. We measure these on site so the plans are accurate.

On older buildings in the town centre, a fascia with individual letters and soft lighting usually suits the street better than a deep lightbox. We show you options on a photo of your building before the drawings are finalised.

Council consent and landlord approval are separate, and many leases need both. For the sign itself, see illuminated signs and fascia signs, or shop signs Eccles.

Plan the timing too. The council needs several weeks to decide and the sign is only made after consent is granted, so if you are opening on a fixed date, start the application early. Tell us the date when you first get in touch and we will work back from it, so the survey and drawings are not what holds things up.

Frequently asked questions

Which council decides sign applications in Eccles?

Eccles is in the City of Salford, so Salford City Council is the local planning authority.

Does a totem at our entrance need consent?

Freestanding signs often do, depending on size, height, lighting and position. We check and tell you.

How long should we allow?

Several weeks for the decision, plus the survey and drawings before and the making and fitting after.

Is the council fee included?

Yes. We include it in the quote so you see the full cost.

Can we put the sign up early?

It is safer to wait for consent, because an unapproved sign can face enforcement.

What if the application is refused?

We review the reasons, revise the design and discuss whether to submit again.

Sign applications in Salford, Stretford and Leigh

We prepare advertisement consent applications in Salford, Stretford and Leigh too. See the Eccles print and signage page for our other local services.

Planning a sign? Call 0161 315 1151, WhatsApp 07737 902425 or use our quote form.

Ready to get started?

Tell us what you need and we'll come back with an honest, fixed-price quote — no obligation.